AECOM, 2017. Combined Irrigation / Flood Control Storage in Upper Rangitāiki – Initial Feasibility Study. AECOM NZ Ltd.

Allard S and Fransen D. 2017. Rangitaiki Geotech Investigations, location of recent test sites. Bay of Plenty Regional Council

Allen & Clarke. 2007. Update of Edgecumbe Flood Mitigation Study: Economic and Funding Analysis of Flood Hazard Mitigation Options. Allen & Clarke Policy and Regulation Specialists Ltd.

Arts, V. 2005. Review of the Flood Carrying Capacity of the Tarawera River below State Highway 30. Environment Bay of Plenty.

Askey, P. 2011. Edgecumbe Rangitāiki Plains Flood Mitigation Project. Opus International Consultants Ltd.

Askey, P. Wiles L. and Dennison D. 2007. Edgecumbe Urban & Rural Flood Hazard – Mitigation Options Study: Business Case Issue. Opus International Consultants Ltd.

Astudillo, J. 2011. Review of the Matahina Dam Flood Management Procedures. URS New Zealand Ltd.

Astudillo, J. 2012. Rangitāiki River Modelling Report. URS New Zealand Ltd.

Astudillo. J. 2014. Rangitāiki Tarawera Flood Mitigations Optioneering. URS New Zealand Ltd.

Beca. 2009. Matahina Hydroelectric Power Scheme Reconsenting Project: River Hydrology, Hydraulics and Bank Erosion. Beca Infrastructure Ltd.

Belleville, R. 2011. Hydraulic Capacity Review Rangitāiki River and Reids Floodway, February 2011. Opus.

Blackwood, P.L. 2000. Review of the Flood Carrying Capacity of the Rangitāiki River Below Edgecumbe. Environment Bay of Plenty.

Blackwood, P.L. 2011. Rangitāiki at Te Teko (1949 to 2007 inclusive + 1925, 1926 & 1944). Unpublished Spreadsheet analysis. Bay of Plenty Regional Council.

Boothway, D. 2014. 2015-2045 Infrastucture Strategy (Flood Protection and Control Works), Bay of Plenty Regional Council.

BOPCC, 1964a. Rangitaiki River Major Scheme: Volume 1 – E.D. Revington and others. 1964. Bay of Plenty Catchment Commission.

BOPCC, 1964b. Rangitaiki River Major Scheme: Volume 2 – Appendices. (Economics, Benefits, Soils & Agriculture). 1964. Bay of Plenty Catchment Commission.

BOPCC, 1964c. Rangitaiki River Major Scheme: Volume 3 (detailed design). Bay of Plenty Catchment Commission.

BOPCC, 1964d. Rangitaiki River Major Scheme: Volume 4 – Plans. Bay of Plenty Catchment Commission.

BOPCC. 1968. The Operation of Matahina Dam During Floods. Bay of Plenty Catchment Commission.

BOPCC. 1973a. Bay of Plenty Catchment Commission – Rangitāiki-Tarawera Rivers Major Scheme Edgecumbe Stopbank – Details Concrete Wall No. 1. Bay of Plenty Catchment Commission.

BOPCC. 1973b. Bay of Plenty Catchment Commission – Rangitāiki-Tarawera Rivers Major Scheme Edgecumbe Stopbank – Details Concrete Wall No. 2. Bay of Plenty Catchment Commission.

BOPRC, 1993a. Rangitāiki River Scheme Floodwall Restoration Edgecumbe. Contract 93-02. R674. Bay of Plenty Regional Council.

BOPRC, 1993b. Bay of Plenty Regional Council – Rangitaiki River Scheme – Rangitāiki River Left Bank – Edgecumbe Floodwall Restoration Site Plan & Concrete Wall 1 Construction – sheet 1 of 4. Bay of Plenty Regional Council.

BOPRC, 1993c. Bay of Plenty Regional Council – Rangitaiki River Scheme – Rangitāiki River Left Bank – Edgecumbe Floodwall Restoration Wall 2 Construction – Option A – sheet 2 of 4. Bay of Plenty Regional Council.

BOPRC, 1993d. Bay of Plenty Regional Council – Rangitaiki River Scheme – Rangitāiki River Left Bank – Edgecumbe Floodwall Restoration Wall 2 Construction – Option B – sheet 3 of 4. Bay of Plenty Regional Council.

BOPRC, 1993e. Bay of Plenty Regional Council – Rangitaiki River Scheme – Rangitāiki River Left Bank – Edgecumbe Floodwall Restoration Wall 2 Construction – Option B – sheet 4 of 4. Bay of Plenty Regional Council.

BOPRC, 2009a. Edgecumbe-Rangitāiki Flood Mitigation Project – Geotechnical Strengthening Works Details. Bay of Plenty Regional Council. B. Crabbe

BOPRC, 2009b. Rangitāiki Geotechnical work site maps 1 (M1804) by section name as at May 2009-1 Bay of Plenty Regional Council.

BOPRC, 2009c. Rangitāiki Geotechnical work site maps 2 (M1804) by section name as at May 2009-2 Bay of Plenty Regional Council.

BOPRC, 2010. Edgecumbe – Rangitāiki Plains Flood Mitigation Works. July 2010 Progress Report to Department of Internal Affairs. B. Crabbe.

BOPRC, 2011a. Edgecumbe – Rangitāiki Plains Flood Mitigation Works – 30 June 2011 Progress Report to Department of Internal Affairs. B. Crabbe. Bay of Plenty Regional Council.

BOPRC, 2011b. Bay of Plenty Regional Council Environmental Hazards Group Legal Submissions and Evidence. Bay of Plenty Regional Council.

BOPRC, 2012a. 2011/12 Rivers and Drainage Asset Management Plan Executive Summary. GHD Limited in conjunction with staff from Bay of Plenty Regional Council

BOPRC, 2012b. 2011/12 Rivers and Drainage Asset Management Plan. Bay of Plenty Regional Council.

BOPRC, 2012c. Edgecumbe – Rangitāiki Plains Flood Mitigation Works – 30 June 2012 Progress Report to Department of Internal Affairs. B. Crabbe. Bay of Plenty Regional Council.

BOPRC, 2012d. Hydrological and Hydraulic Guidelines. Bay of Plenty Regional Council

BOPRC, 2014a. Report of the River Scheme Sustainability Regional Council Workshop. Bay of Plenty Regional Council.

BOPRC, 2014b. Edgecumbe – Rangitāiki Plains Flood Mitigation Works – 30 June 2014 Progress Report to Department of the Prime Minister and Cabinet. R. Waugh. Bay of Plenty Regional Council.

BOPRC, 2014c. Appendix to Flood Mitigation Works report to DPMC dated June 2014. Map 1 of geotechnical work sites (as at 2014). Bay of Plenty Regional Council.

BOPRC, 2014d. Appendix to Flood Mitigation Works report to DPMC dated June 2014. Map 2 of geotechnical work sites (as at 2014). Bay of Plenty Regional Council.

BOPRC, 2014e. Rangitāiki River Geotechnical Works Schedule as at 31 May 2014 – xls. S Southerwood

BOPRC, 2015a. Minutes of the Regional Council Meeting held in Mauao Rooms, Bay of Plenty Regional Council Building, 87 First Avenue, Tauranga on Tuesday, 19 May 2015 commencing at 9.30 a.m. Bay of Plenty Regional Council.

BOPRC, 2015b. Bay of Plenty Regional Council Long Term Plan 2015-2025: Flood Protection and Control Group of Activities. Bay of Plenty Regional Council.

BOPRC, 2017a. Resource Consent 65750-AP – Trustpower Limited, 13 April 2017. Bay of Plenty Regional Council.

BOPRC, 2017b. R Plans. Bay of Plenty Regional Council.

Britton, R. 2008. Rangitāiki Tarawera Floodplain Management Strategy Stage 1. Britton Consultants Ltd.

Britton, R. 2011. Flood Risk Assessment of the Rangitāiki Plains. Britton Consultants Ltd.

Brown, S. 2016. Rangitāiki River – Overview of Hydro Scheme Consents. Opus International Consultants Ltd.

Bruning, N. 2014a. Matahina Dam Consent Condition Monitoring Review – letter to Chief Executive of Bay of Plenty Regional Council. Rangitāiki-Tarawera Rivers Scheme Liaison Group.

Bruning, N. 2014b. Rangitāiki Floodway Project – letter to Chief Executive of Bay of Plenty Regional Council. Rangitāiki-Tarawera Rivers Scheme Liaison Group.

Butcher, 1994. Review of Flood Protection Scheme Maintenance. Ministry for the Environment Report. Caldwell, M. 2017.

Monitoring of TrustPower’s Matahina Hydroelectric Resource Consent. Bay of Plenty Regional Council.trust

CMW, 2016. Rangitāiki River and Floodway, Edgecumbe – Geotechnical Investigation Report. CMW Geosciences.

Cowie. C.A. 1957. Floods in New Zealand 1920-1953 with Notes on Earlier Floods. (Hard copy available in BOPRC library. No electronic link)

Crabbe, B. 2011. Supplementary Statement of Evidence of Bruce Kelvin Crabbe in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Bay of Plenty Regional Council.

Crabbe, B. 2017. Rangitaiki-Tarawera Rivers Scheme & Rangitāiki Drainage Scheme Presentation to Rangitaiki River Forum, 7 February 2017. Bay of Plenty Regional Council.

Creagh, H and Mahupuku, S. 2013. Upper Rangitaiki River Catchment Water Consents Bay of Plenty Regional Council.

Dahm, J. 1988. Preliminary Investigation of the Influence of Matahina Power Station on River Bank Stability along the Rangitāiki River. Works Consultancy Services Hamilton.

Dennis, S. 2009a. 2008/2009 Rivers and Drainage Asset Management Plan – June 2009 Executive Summary. GHD Limited.

Dennis, S. 2009b. 2008/2009 Rivers and Drainage Asset Management Plan – June 2009. GHD Limited. Dennison, D. 2006.

Reids Central Floodway Stopbank Stability Assessment, Environment Bay of Plenty -Geotechnical Report No. 2447. Opus

Dine, P.D. Journeaux, P and Pemberton, D.G.1988. Rangitāiki River Scheme Post 1987 Earthquake. Bay of Plenty Catchment Board.

Dunlop, T.D. 2012. Rangitāiki – Tarawera Scheme: Flood Damage Priorities 2012-2013 & 2013-2014 Programme. Spreadsheet of flood damage work priorities for Rangitāiki Tarawera Rivers Scheme Liaison Group meeting, 8 November 2012. Bay of Plenty Regional Council.

EBOP, 2005a. Bay of Plenty Region July 2004 and December 2004 Flood Events – Claim by Environment Bay of Plenty for Government Assistance towards Response Costs and Costs of Reinstatement of Damaged River and Drainage Scheme Infrastructural Assets. Environment Bay of Plenty.

EBOP, 2005b. Rangitāiki Tarawera Major Rivers Scheme – Rangitāiki River Concrete Floodwalls on East Bank and West Bank Roads Upstream of Thornton Bridge Stopbank Restoration Works Contract No. 2003- 09. Plans and Cross Sections (COVER). Environment Bay of Plenty.

EBOP, 2005c. Rangitāiki – Tarawera Major Rivers Scheme. Rangitāiki River – Right Bank Concrete Floodwall – East Bank Road. Contract 2003-09. Cross Sections 0m to 81m. Environment Bay of Plenty.

EBOP, 2005d. Rangitāiki – Tarawera Major Rivers Scheme. Rangitāiki River – Left Bank Concrete Floodwall – West Bank Road. Contract 2003-09. Cross Sections 1893m to 2050m. Environment Bay of Plenty.

EBOP, 2005e. Rangitāiki – Tarawera Major Rivers Scheme. Rangitāiki River – Left Bank Concrete Floodwall – West Bank Road. Contract 2003-09. Cross Sections 1893m to 2050m (REVISED). Environment Bay of Plenty.

EBOP, 2006a. Bay of Plenty Region July 2004 and December 2004 Flood Events FINAL CLAIM from Environment Bay of Plenty for Government Assistance towards Response Costs and Costs of Reinstatement of Damaged River and Drainage Scheme Infrastructural Assets. Environment Bay of Plenty.

EBOP, 2006b. Hydraulic Modelling of the Rangitāiki Plains Tarawera River to Rangitāiki River. Environment Bay of Plenty.

EBOP, 2007a. 2% AEP Flood Level Contour Map Rangitāiki Plains between Tarawera and Rangitāiki Rivers. Environment Bay of Plenty.

EBOP, 2007b. Environmental Data Summaries. Air Quality, Meteorology, Rainfall, Hydrology and Water Temperature Report to 31 December 2005. Environment Bay of Plenty.

EBOP, 2008. Strategic Policy Publication 2008/01 – Rangitāiki Tarawera Floodplain Management Strategy Stage 1. Environment Bay of Plenty.

Ellery, G. 2017. Hydro-meteorological Report of April 2017 Storm Even & Cyclone Cook. Draft Report, Bay of Plenty Regional Council.

Fransen, D. and Waugh, R. 2015a. 2014-2015 Rivers and Drainage Asset Management Plan Executive Summary. Bay of Plenty Regional Council.

Fransen, D. and Waugh, R. 2015b. 2014-2015 Rivers and Drainage Asset Management Plan – Draft. Bay of Plenty Regional Council.

Gibbons, W.H. 1990. The Rangitaiki 1890-1990 : Settlement and Drainage on the Rangitāiki.

Gillon, M. and Webby, G. 1989. Matahina Dam Report on Breaching by Overtopping and Internal Erosion.Works and Development Services Corporation. (Hard copy).

Gow, P. 2011. Statement of Evidence of Platt Gow in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme.

Grogan, E. and Townsend. M. 2016. Flood Event 19 February 2016. Bay of Plenty Regional Council.

Hamm, V. 2011 Legal Submissions on behalf of the Applicant in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Hobec.

Hill, G., Bickers. A., van Voorthuysen. R. 2011. Hearings Committee meeting held 28-30 June and 4-8 July 2011 to hear TrustPower Limited Application numbers 65750, 65751 65752, 65753 and 65754.

Ice Geo & Civil, 2005a. Rangitāiki River Stopbanks Review of Stability, prepared for Environment Bay of Plenty, September 2005.

Ice Geo & Civil, 2005b. Rangitāiki River Stopbanks Review of Stability Volume 2 Appendices, prepared for Environment Bay of Plenty, September 2005.

Ice Geo & Civil, 2006a. Rangitāiki River Stopbanks Assessment 63A College Road Edgecumbe, prepared for Environment Bay of Plenty, July 2006.

Ice Geo & Civil, 2006b. Rangitāiki River Stopbanks Assessment Section 1 Left Bank 10300 to 10400m, prepared for Environment Bay of Plenty, February 2006.

Ice Geo &Civil, 2006c. Rangitāiki River Stopbanks Assessment Section 13 Left Bank 10600 to 11200m, prepared for Environment Bay of Plenty, August 2007.

Ice Geo & Civil, 2006d. Rangitāiki River Stopbanks Assessment Section 2 Left Bank 9100 to 9300m, prepared for Environment Bay of Plenty, April 2006.

Ice Geo & Civil, 2006e. Rangitāiki River Stopbanks Assessment Section 3 Left Bank 11500 to 12200m, prepared for Environment Bay of Plenty, April 2006.

Ice Geo & Civil, 2006f. Rangitāiki River Stopbanks Assessment Section 5 Left Bank 11200 to 11500m, prepared for Environment Bay of Plenty, July 2006.

Ice Geo & Civil, 2006g. Rangitāiki River Stopbanks Assessment Section 6 Right Bank 11850 to 12300m, prepared for Environment Bay of Plenty, May 2006.

Ice Geo & Civil, 2007a. Rangitāiki River Stopbanks Assessment Miro Place, Right Bank 11200 to 11850m, prepared for Environment Bay of Plenty, December 2007.

Ice Geo & Civil, 2007b. Rangitāiki River Stopbanks Assessment Moore Road Seepage Problems, prepared for Environment Bay of Plenty, July 2007

Ice Geo & Civil, 2007c. Rangitāiki River Stopbanks Assessment Section 15 Left Bank 9300 to 9900m, prepared for Environment Bay of Plenty, October 2007.

Ice Geo & Civil, 2008a. Rangitāiki River Stopbanks Assessment Section 6 Addendum Right Bank 11850 to 12300m, prepared for Environment Bay of Plenty, September 2008.

Ice Geo & Civil, 2008b. Reid’s Canal: Right Bank Cross Section 4 – Geotechnical Assessment, prepared for Environment Bay of Plenty, August 2008.

Ice Geo & Civil, 2009. Rangitāiki River Stopbanks Assessment Section 4 Right Bank 4800 to 6300m, prepared for Environment Bay of Plenty, April 2009.

Ice Geo & Civil, 2010. Rangitāiki River Stopbanks Assessment Otakiri Road to Kōkōhinau Left Bank 12300 to 16100m.

Ice Geo & Civil, 2011. Rangitāiki River Stopbanks Assessment Section 7 – Waiari Left Bank 17700 to 18500m. Civil, 2012.

Ice Geo & Civil Reids Canal Floodway Widening (1050 to 2900m) Geotechnical Assessment. Civil, 2013.

Ice Geo and Civil Reids Canal Floodway Upgrading Stage 3 (0m to 970m) Geotechnical Assessment.

Ice Geo & Civil, 2014a. Rangitāiki River Stopbanks Assessment, Reynold’s Bend Right Bank 3040 to 4700m, prepared for Bay of Plenty Regional Council, June 2014.

Ice Geo & Civil, 2014b. Transpower Edgecumbe Substation 33kV Indoor Conversion – Assessment of Effects on Security of the Rangitāiki River Stopbank.

Ice Geo & Civil, 2015. Reids Canal Floodway Upgrading Stage 3 (0m to 970m) Geotechnical Assessment Right Bank Addendum.

Ingle, C and Crabbe, B. 2017. June 2016 Flood Damage Costs. Report to 14 February 2017 Bay of Plenty Regional Council Meeting.

Jones, J. 1987. Report On The Earthquake Of 2 March, 1987 and its effect on Bay of Plenty Catchment Commission and Rangitāiki Drainage Board Rivers and Drainage Schemes, Functions And Responsibilities. Bay of Plenty Catchment Commission.

Law. A. 2011. Statement of Evidence of Alan Law in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme.

Lawrie. A.W. 2004. Application to Government for Financial Assistance July 2004 Storm, Flood and Earthquake Events. Environment Bay of Plenty.

Levy. G. 2011a. Supplementary Statement of Evidence of Graham John Levy in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Beca Infrastructure Ltd.

Levy. G. 2011b. Matahina Operation – Overview of Proposed Operating Changes. Beca Infrastructure Ltd.

Levy. G. 2011c Statement of Evidence of Graham John Levy in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Beca Infrastructure Ltd.

Macleod. M. 2015. Matahina Dam Consent. Letter to Councillor Bruning, 4 February 2015. Bay of Plenty Regional Council.

Macleod. M. and Tarboton. K. 2010. August 2010 Flood damage costs. Presentation to Regional Council, 30 September 2010. Bay of Plenty Regional Council

Macleod. M. and Tarboton. K. 2012. Rangitāiki-Tarawera Rivers Scheme Capex Transfers in 2011/12 Annual Plan. Presentation to Regional Council, 15 March 2012. Bay of Plenty Regional Council.

Male. J. and Astudillo, J. 2015. Rangitāiki Spillway Optimisation. AECOM. NZ Ltd.

Maltai, K. 2014. Regional Flood Risk Management Framework, Bay of Plenty Regional Council.

Millias , P. 2008. Matahina Hydrolelectric Power Scheme Reconsenting Project: River Hydrology, Hydraulics and Bank Erosion. Beca Infrastructure Limited. November 2008. (Hard copy only)

Muir. S. 2011. Statement of Evidence of Scotty Muir in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme.

Opus. 1999a. Concrete wall anchor. College Road Edgecumbe. Sheet 1 of 2. Opus International Consultants.

Opus. 1999b. Concrete wall anchor. College Road Edgecumbe. Sheet 2 of 2. Opus International Consultants.

Opus. 2000. Stopbank Assessment Rangitaiki River Edgecumbe – Geotechnical Report No 2069. D Dennison, Opus International Consultants. 

Orgias. S. 2010. Reid Canal Stopbanks Geotechnical Study. Riley Consultants.

Pak, I. 2006. NERMN River and Stream Channel Monitoring Programme. Environment Bay of Plenty Publication 2006/15.

Pemberton, D.G. 1991. Edgecumbe Earthquake: 2 March 1987. Impact on flood protection and drainage. (Hard Copy Only – available in BOPRC library)

Philpott, W.J.L. 2011a. Under S42A of the Resource Management Act Report of William John Langdon Philpott, Consulting Engineer, in the matter of application for Resource Consent 65750 by the Trust Power Limited for Activities associated with the operation of the Matahina Dam. Philpott & Associates Ltd.

Philpott. J. 2011c. Supplementary Statement of Evidence of John Philpott in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme.

Philpott. W.J.L. 2011b. Final Report of William John Langdon Philpott, Consulting Engineering, the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Philpott & Associates Ltd.

Rangitaiki River Forum. 2015. Te Ara Whānui o Rangitaiki Pathways of the Rangitaiki – River document February 2015. (Also referred to as RRF, 2015).

RTLG. 2014. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 4 December 2014. Bay of Plenty Regional Council.

RTLG. 2015a. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 11 March 2015. Bay of Plenty Regional Council.

RTLG. 2015b. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 11 November 2015. Bay of Plenty Regional Council.

RTLG. 2016a. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 9 March 2016. Bay of Plenty Regional Council.

RTLG. 2016b. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 9 November 2016. Bay of Plenty Regional Council.

RTLG. 2017a. Rangitāiki-Tarawera Rivers Scheme Advisory Group Terms of Reference. Bay of Plenty Regional Council.

RTLG. 2017b. Rangitāiki-Tarawera Rivers Scheme Liaison Group Meeting, 8 March 2017

Smith. F. 2014. Rangitaiki Spillway Options Analysis Report Pattle Delamore Partners Ltd.

Stokes. S. and Tarboton. K. 2016. Rangitāiki River – Overview of Hydro Scheme Consents. Presentation to Rangitāiki River Forum, 22 June 2016. Bay of Plenty Regional Council.

Tarboton, K and Boothway, D. 2014a. Rangitaiki Floodway Project Update. Report on progress to Bay of Plenty Council. Regional Direction and Delivery Committee. 30 October 2014

Tarboton, K and Crabbe, B. 2010. 13-15 August 2010 Flood Event. Presentation to Regulation Monitoring and Operations Committee, 7 September 2010. Bay of Plenty Regional Council.

Tarboton, K and Crabbe, B. 2012. Memorandum to Regional Council Workshop  – Flood Protection and Control Works Programme, 28 November 2012.. Bay of Plenty Regional Council.

Tarboton. K and Crabbe. B. 2008. July Storm Event Report. Presentation to Operations Committee, 17 September 2008. Environment Bay of Plenty.

Tarboton. K and Crabbe. B. 2011a. Flood damage costs from August 2010 and January 2011 floods. Report to Bay of Plenty Regional Council – Operations, Monitoring & Regulation Committee. 23 March 2011.

Tarboton. K and Crabbe. B. 2011b Options to fund River Scheme flood damage – 3 May 2011. Report to Bay of Plenty Regional Council – Operations, Monitoring & Regulation Committee. 3 May 2011.

Tarboton. K and Crabbe. B. 2013a. Capital Expenditure Re-phasing Request for Flood Repair Work on Rangitāiki-Tarawera and Waioeka-Otara Rivers Schemes. Presentation to Regional Council, 31 January 2013. Bay of Plenty Regional Council.

Tarboton. K and Crabbe. B. 2013b. Rangitāiki Floodway Widening Issues and Options Report. Presentation to Operations, Monitoring and Regulation Committee, 13 February 2013. Bay of Plenty Regional Council.

Tarboton. K and James. M. 2013. Rangitāiki-Tarawera Floodplain Management Strategy, Overview. Presentation to Rangitāiki River Forum, 8 February 2013. Bay of Plenty Regional Council.

Tarboton. K and Meadowcroft. C. 2012. 1 January 2012 Flood Event. Presentation to Operations, Monitoring and Regulation Committee, 22 February 2012. Bay of Plenty Regional Council.

Tarboton. K and O’Rourke. G. 2009. Lake Aniwhenua Flood Control Dredging. Presentation to Monitoring & Operations Committee, 18 August 2009. Environment Bay of Plenty.

Tarboton. K and Townsend. M. 2015. Deliberations Position Paper – Rangitāiki Floodway and Spillway Project Acceleration. Presentation to Regional Council, 19 May 2015. Bay of Plenty Regional Council.

Tarboton. K and Waugh. R. 2009a. Rivers and Drainage Asset Management Plan. Presentation to Operations Committee, 18 March 2009.. Environment Bay of Plenty.

Tarboton. K and Waugh. R. 2009b. Rivers and Drainage Asset Management Plan. Presentation to Regional Council, 24 June 2009. Environment Bay of Plenty.

Tarboton. K and Waugh. R. 2010. August 2010 Flood Event. Presentation to Regulation Monitoring & Operations Committee, 7 September 2010. Bay of Plenty Regional Council

Tarboton. K and Waugh. R. 2014. River Scheme Flood Damage Project Completion Report. Presentation to Regional Direction and Delivery Committee, 30 October 2014. Bay of Plenty Regional Council.

Tarboton. K. 2007a. Floodplain Management Strategies. Presentation to Strategic Policy Committee, 27 November, 2007. Environment Bay of Plenty.

Tarboton. K. 2007b. Rivers and Drainage Group Report. Presentation to Operations Committee, 29 November 2007. Environment Bay of Plenty.

Tarboton. K. 2008a. Edgecumbe-Rangitāiki Flood Mitigation. Presentation to Operations Committee, 9 April 2008. Environment Bay of Plenty.

Tarboton. K. 2008b. Rangitāiki Tarawera Floodplain Management Strategy Stage 1. Presentation to Strategy Policy Committee, 15 October 2008. Environment Bay of Plenty.

Tarboton. K. 2008c. Rivers and Drainage Group Report. Presentation to Operations Committee, 15 May 2008. Environment Bay of Plenty.

Tarboton. K. 2008d. River Scheme Capital Works Reprioritisation. Presentation to Operations Committee, 15 December 2008. Environment Bay of Plenty.

Tarboton. K. 2008e. Asset Management Planning. Presentation to Operations Committee, 17 September 2008. Environment Bay of Plenty.

Tarboton. K. 2008f. Rivers and Drainage Asset Management Plan Report to Rangitāiki-Tarawera Rivers Scheme Liaison Group, 20 November 2008. Environment Bay of Plenty.

Tarboton. K. 2016. Overview – Rangitāiki River Hydro Schemes. Rangitāiki River Forum – 22 June 2016. Bay of Plenty Regional Council.

Tarboton. K. and Maltai, K. 2015. Upper Rangitāiki Flood Management Investigation. Presentation to Rangitāiki River Forum, 20 October 2015. Bay of Plenty Regional Council.

Tarboton. K., Boothway, D., Crabbe. B. 2014a. Council Workshop – River Scheme Sustainability. Bay of Plenty Regional Council.

Tarboton. K., Boothway. D., Waugh. R. 2014. River Scheme Sustainability, Council Workshop 31 July 2014. Bay of Plenty Regional Council.

Tarboton.K. and Brown. K, 2012. Adoption of Council’s Asset Management Plans 2012. Presentation to Regional Council, 28 June 2012. Bay of Plenty Regional Council.

Tate. D.R. 2011 Statement of Evidence of Donald Robert Tate in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Riley Consultants Ltd.

Taylor. M. 1988. Rangitaiki Drainage Board Thornton West Drainage. Rangitaiki Drainage Board.

The Audit Office. 1992. A review of the Rangitāiki River Post-1987 Earthquake Scheme Managed by The Bay of Plenty Regional Council. The Audit Office.

Thompson, D. 2016. Flood Warning Manual. Bay of Plenty Regional Council. (Also referred to as FWM, 2016).

Titchmarsh. R. 1996. Rangitāiki Tarawera River Scheme Maintenance Review. Environment Bay of Plenty.

Tonkin and Taylor. 2008. Matahina Dam Reconsenting Civil and Geotechnical AEE Assessment. July 2008. (Hard copy only).

Tonkin and Taylor. 2013. Regional Flood Risk Management Strategy. Summary of Previous Work and Literature Survey. Tonkin and Taylor.

Tozer, C., Askey, P., Abiss, C. and Eastham, D. Edgecumbe- Rangitaiki Plains Flood Mitigation Works: Resource Consent Application Opus. 2008.

Resource Consent Application: Edgecumbe – Rangitāiki Plains Flood Mitigation Works. Opus International Consultants.

TrustPower. 2016. Lake Matahina Flood Management Plan, Trustpower Limited, January 14 (updated 2016) TrustPower Limited.

Van Beek. G. 2011. Statement of Evidence of Gerardus Franciscus van Beek in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme

Van Toan. D. 2011 Statement of Evidence of Do Van Toan in the matter of resource consent applications by TrustPower for Matahina Hydroelectric Power Scheme. Beca Infrastructure Ltd.

Wallace. P. 1998. Rangitāiki – Tarawera Rivers Scheme Asset Management Plan. Environment Bay of Plenty. 

Wallace. P. 2006. Hydraulic Modelling of Rangitāiki Plains Tarawera River to Rangitāiki River. Environment Bay of Plenty Operations Publication 2006/06.

Wallace. P. 2010. Rangitāiki River Modelling Review – letter to Colin Meadowcroft. River Edge Consulting Ltd.

Wallace. P. 2011a. Hydraulic Modelling of the Rangitāiki Plains, report prepared for the Bay of Plenty Regional Council. River Edge Consulting Ltd.

Wallace. P. 2011b. Rangitaiki Plains – Further Hydraulic Modelling. River Edge Consulting Ltd.

Wallace. P. 2013a. Rangitaiki Spillway Upgrade Option Modelling. River Edge Consulting Ltd.

Wallace. P. 2013b. Developing a Rangitāiki Tarawera Floodplain Management Strategy – Stage 2. River Edge Consulting Ltd.

Wallace. P. 2013c. Rangitāiki Tarawera Floodplain Management Strategy Stage 3 (draft). River Edge Consulting Ltd.

Waugh. R., Crabbe. B. 2010. August 2010 Flood Event. Memorandum to Executive Leadership Team Environment Bay of Plenty, 19 August 2010. Environment Bay of Plenty

Webby, G. 2011. Hydraulic Capacity Review Rangitāiki River and Reids Floodway. Opus International Consultants.

West. P. 2012. Memorandum: Matahina Dam Flood Management; Spillway Discharge; Flood Travel Times from Catchment Sub-Basins. Bay of Plenty Regional Council.

West. P. 2015a. BOPRC Flood Forecasting – Rain Radar Processing. Notes Memorandum. Blue Duck Design.

West. P. 2017. April 5-7 2017 Flood; Post-event analysis of river flows and lake levels relating to Matahina Dam and the lower Rangitāiki River, BOPRC Memo (in preparation).

Wiles. L. 2006. Edgecumbe Flood Mitigation Study. Economic & Funding Analysis of Flood Hazard Mitigation Options. Opus.